Hakkilankaari 2 – Alteration Works
This production and warehouse building underwent extensive alterations. Numerous structural modifications were carried out to accommodate new production equipment. Structures were demolished, rebuilt, and strengthened.
For us, this project represented renovation at its best. The many structural changes provided interesting problem-solving challenges and required rapid response. We also performed a structural condition assessment of the building’s wide-span hall structure.
Summary
Project: Production and logistics centre renovation
Location: Vantaa
Size: 10 200 m2 (new area 70 m2)
Scope: Structural design and consultation
Client: Talokaivo Oy
Year: 2023
Location: Vantaa
Size: 10 200 m2 (new area 70 m2)
Scope: Structural design and consultation
Client: Talokaivo Oy
Year: 2023